top of page
Untitled design (8).png

 “Being a subcontractor in such a specialized field allows you to be a part of many prestigious projects but the downside is that when there is a lull in the market like during COVID we take a harder hit since; design elements and creative architecture takes a back seat. So we have to rely on our doors and windows division to keep us going” says Siddhesh Mulaokar, Operations Manager of Prime Metal Craft.  Having two parallel work streams is very common for such subcontractors since it is only a variety of sub-contracts that can keep you afloat in such a market. Jesser is another such subcontractor that has been able to make it because of varied subcontracts they undertake. - Siddhesh Mulaokar for CONSTRUCTION WEEKLY 

Construction Weekly September 2020

Untitled design (10).png

Gulf News

April 2020

Even during a lock down the creativity for Prime Metal Craft didn't stop. Since more time was being devoted to art and design there was a flow of a lot of good ideas which will  eventually translate to innovative solutions for architectural design at work  - Prashant Mulaokar for GULF NEWS

bottom of page